Open the Machine Center Load window.

Shows a list for the load on a machine center. The load on a machine center is the sum of the required number of times that all the planned and actual orders are run on the machine center in a specified period.

Options

Starting Date: Enter the starting date for the machine center load evaluation.

No. of Periods: Enter the number of time intervals that the evaluation is to be created for.

Period Length: Enter the length of a time interval, for example 1W = one week.

Load bigger than (pct.): Here you can enter a filter to print only machine centers whose loads exceed this percentage, for example, if you want to print all machine centers with a load of over 95% in order to troubleshoot a particular problem.

Tip