For items that are set up with backward flushing method, the default behavior is to calculate and post component consumption when you change the status of a released production order to Finished. For more information, see Flushing Method.

If you also define routing link codes, then calculation and posting occurs when each operation is finished, and the quantity that was actually consumed in the operation is posted. For more information, see How to: Create Routing Links.

For example, if a production order to produce 800 meters requires 8 kg of a component, then when you post 200 meters as output, 2 kg are automatically posted as consumption.

This functionality is useful for the following reasons:

The following procedure shows how to combine backward flushing and routing link codes so that the quantity that is flushed for each operation is proportional to the actual output of the finished operation.

To flush components according to operation output

  1. In the Search box, enter Items, and then choose the related link.

  2. Select the component that you want to set up. On the Home tab, in the Manage group, choose Edit.

  3. On the Replenishment FastTab, in the Flushing Method field, select Forward.

    Note
    Select Pick+ Forward if the component is used in a location that is set up for directed put-away and pick.

  4. In the Search box, enter Routings, and then choose the related link.

  5. Define routing link codes for every operation that consumes the component. For more information, see How to: Create Routing Links.

  6. In the Search box, enter Production BOM, and then choose the related link.

  7. Define routing link codes from each instance of the component to the operation where it is consumed. For more information, see How to: Create Routing Links.

    Important
    The component must have a routing link to the last operation in the routing.

Tip

See Also